Our portfolio consists of over 288 MWp of power plants.

Powered by the world with the eternal energy of the sun

Projects

The company aims to complete 2 GWp of installed capacity by 2027.

The Group’s core portfolio is based in Chile, where we now manage over forty photovoltaic power plants with a total capacity of over 262 MWp.
Other locations
with successfully implemented photovoltaic parks include the Czech Republic, Slovakia, Romania and Cyprus.

SOLEK is driven by green energy solutions, which is why we continuously we are looking for ways to diversify our portfolio.
The group is now focusing on new
and promising areas such as floating photovoltaic power plants, agrovoltaics, wind power, battery storage or hybrid projects.
It is also worth mentioning the cooperation on the construction of a green hydrogen power plant with the Chilean port of Puerto San
Antonio.

Our solar power plants in numbers

of connected solar power plants
0 MWp
solar power plants under construction
0 MWp
the target that SOLEK wants to connect by the end of 2028
0 GW

Data as of 15 April 2024 4. 2024

Projects

Where we operate

Chile

Number of power plants built: 32

Of which own 18

Total power: 207 MWp

Projects

Chile

Bicentenario

MWp 2.99
Year 2020
Location
Parral, Maule, Chile
The Bicentenario solar park, with a total installed capacity of 2.99 MWp, was connected to the grid in 2020. In February 2021, the SOLEK Group sold the project to the investment company Rockville Energy Holdings SpA, part of the Rockville Capital Group. SOLEK Group continues to provide professional O&M services to ensure the plant remains fully operational, helping fulfill the Chilean government’s goal of securing 60% of electricity from renewable sources by 2035.

Santa Fe

MWp
10.34

Year
2020

Description
The Santa Fe solar park, with a total installed capacity of 10.34 MWp, is another SOLEK Group power plant built under the PMGD regime—distributed energy resources through which Chile ensures its energy security by diversifying its power generation geographically. Located in the Maule region, south of the Chilean capital, Santiago, the project was completed in 2019 and subsequently connected to the National Electric System.

Villa Alegre

MWp
10.66

Year
2020

Description
The Villa Alegre solar park, with a total installed capacity of 10.66 MWp, is another SOLEK Group power plant in the Maule region, south of the Chilean capital, Santiago. It was connected to the grid in 2020 and built under the Pequeños Medios de Generación Distribuida (PMGD) regime—distributed energy resources through which Chile ensures its energy security. The project aligns with the government’s goal of becoming carbon neutral by 2050.

Projects

Cyprus

No results found.

Projects

Romania

No results found.

Projects

Czech Republic

No results found.

Projects

Slovakia

No results found.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.