Our portfolio consists of over 288 MWp of power plants.

Powered by the world with the eternal energy of the sun

Projects

The company aims to complete 2 GWp of installed capacity by 2027.

The Group’s core portfolio is based in Chile, where we now manage over forty photovoltaic power plants with a total capacity of over 262 MWp.
Other locations
with successfully implemented photovoltaic parks include the Czech Republic, Slovakia, Romania and Cyprus.

SOLEK is driven by green energy solutions, which is why we continuously we are looking for ways to diversify our portfolio.
The group is now focusing on new
and promising areas such as floating photovoltaic power plants, agrovoltaics, wind power, battery storage or hybrid projects.
It is also worth mentioning the cooperation on the construction of a green hydrogen power plant with the Chilean port of Puerto San
Antonio.

Our solar power plants in numbers

of connected solar power plants
0 MWp
solar power plants under construction
0 MWp
the target that SOLEK wants to connect by the end of 2028
0 GW

Data as of 15 April 2024 4. 2024

Projects

Where we operate

Chile

Number of power plants built: 32

Of which own 18

Total power: 207 MWp

Projects

Chile

Investor: BlackRock

Quilmo

 

MWp 10.66
Year 2023
Location Chillán Viejo, Ñuble, Chile
Investor: Nala

Pueblo Seco

MWp
10.61

Year
2023

The Pueblo Seco solar park, with a total installed capacity of 10.61 MWp, was completed in March 2023 and is located in the Ñuble region.
SOLEK - IPP, Investor: USPP

El Palqui

MWp
2.99

Year
2023

The El Palqui solar park, with a total installed capacity of 2.99 MWp, was completed in August 2023 and is located in the Coquimbo region.
Projects

Cyprus

No results found.

Projects

Romania

Dzeta SRL

MWp 1.66
Year 2014
Location
Pitesti, South Romania
A project located near the city of Pitesti, Southern Romania. The project was sold by the investor as fully developed, at the ready-to-build stage. The sale also included post-development services, under which we assisted the new project owner with the commissioning of the PV plant (grid connection) and subsequently secured all necessary licenses and certificates required for operation according to valid Romanian legislation. The installed capacity is 1.66 MWp.

Gamma

MWp
2.5

Year
2013

The photovoltaic power plant project is located in close proximity to the village of Redea, in the Olt district of Southern Romania – a location with high solar irradiation per square meter.

TAU

MWp 2.5
Year 2013
Location Redea, Olt, South Romania
Projects

Czech Republic

No results found.

Projects

Slovakia

No results found.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.